The Coronavirus lockdown has obviously brought progress to a halt but as restrictions are lifting, we are able to get some things done.

The electric & gas is being disconnected next week. The electrician has installed the meter box for the temporary electric supply. it cost £907 for Western Power to make the alterations to the electric meter (plus Electrician’s costs) & £533 for Wales & West to disconnect the gas supply including excavating & reinstating all trench work. It’s our responsibility to inform the utility company of this change.

The existing bungalow has asbestos. We had to have an Asbestos Management Survey. This cost £390. The asbestos is low risk but needs to be removed by a specialist. This work is being carried out week commencing 15/6/20 £3620 + VAT

The bungalow is being demolished week beginning 5/7/20. The cost is £8565.